ci-proto
foundation · Continuous Intelligence · 167M · licence: ci-proto Code and Model Licence v1.0 · Model card · Code
ci-proto is Continuous Intelligence's nine-decile forecaster (code and weights released 11 November 2026): 167M parameters adapted from TiRex-2 and xLSTM.
How it was run
Run zero-shot on CPU with a fixed 128-length context through the continuousintelligence package at a pinned weights revision. The licence is Apache-2.0 plus a public attribution notice and a one-time e-mail to the vendor when a product, service or model using its code, weights or outputs is distributed. Training data is undisclosed beyond 'a large corpus of real-world and synthetic time series'; its fev-bench submission declares no fev-bench data.
Nine native deciles, xLSTM backbone adapted from TiRex-2. The tight arm reconstructs the deciles with quantile_dist, the original study's reconstruction.
Resources
- Model card — https://huggingface.co/ContinuousIntelligence/ci-proto
- Code — https://github.com/continuousintelligence/ci
Against laplace, one step ahead
On the interactive leaderboard you can make ci-proto the reference and see every other model paired against it, on any panel or subset of series; the tables below keep laplace as the reference.
Per series, Diebold–Mariano on the log score; a win is the model ahead beyond 1.96 standard errors, a loss laplace ahead, the rest draws. Median ΔLL is the model's log score minus laplace's, in nats per step; CRPS ratio is model over laplace (below 1 favours the model); coverage is the share of outcomes inside the central 90%. The methodology page has the protocol; the leaderboards place the model among the rest.
| arm | panel | series | wins / losses vs laplace | median ΔLL | CRPS ratio | coverage 90 |
|---|---|---|---|---|---|---|
ci-proto(wide)headline | Economic, Weekly | 3,013 | 21% / 30% | -0.018 | 0.896 | 0.897 |
| Economic, Monthly | 5,600 | 24% / 11% | +0.036 | 0.892 | 0.850 | |
| Economic, Daily | 2,210 | 3% / 31% | -0.113 | 0.989 | 0.879 | |
| Economic, Hourly (M4) | 414 | 24% / 12% | +0.042 | 0.945 | 0.885 | |
| Prices, Daily | 8,703 | 4% / 3% | -0.008 | 1.003 | 0.873 | |
ci-prototight reconstruction | Economic, Weekly | 3,013 | 6% / 41% | -0.648 | 0.899 | 0.856 |
| Economic, Monthly | 5,600 | 3% / 34% | -0.723 | 0.897 | 0.790 | |
| Economic, Daily | 2,210 | 1% / 61% | -0.961 | 0.994 | 0.824 | |
| Economic, Hourly (M4) | 414 | 6% / 22% | -0.392 | 0.952 | 0.821 | |
| Prices, Daily | 8,703 | 0% / 37% | -0.583 | 1.008 | 0.809 |
Cost and size
- ci-proto: 481.2 ms per forecast on one CPU thread (speed)
- ci-proto: 669 MB of weights and runtime (size)
References
- No paper has been published for this model; the model card and code linked above are its documentation.
Evaluated on this site in
- Cotton, P. (2026). A stronger univariate benchmark for foundational time-series model evaluation. skaters papers (the protocol and the reconstruction question used on every table here).
- Cotton, P. (2026). On the importance of evaluating foundational time-series models one step ahead in an investment context. PDF (why the leaderboards are one step ahead).
Built 2026-11-23 from skaters commit dd2e107.